BEA is planning to replace an existing subsurface sewage disposal (septic) system with a new subsurface sewage disposal system (3,000-gal septic ta…
The 512-S building, which is currently in the Suspended Operations state, will be modified to temporarily store Strip Effluent (SE) from the Salt W…
LM is proposing to conduct administrative actions, routine operations, and maintenance activities at the Tuba City, Arizona, Disposal Site.…
The project will no longer be installing a septic system and will instead install a sewer line connecting to the existing sewage lagoons located no…
Conduct routine inspections, monitoring, and maintenance activities throughout the year at the Sherwood, WA, Disposal Site based on best management…
The scope of this project is to install new utility lines southeast of SMC Warehouse (TAN-1617).…
The scope of this project is to install new utility lines southeast of SMC Warehouse (TAN-1617).…
Subcontractor shall furnish all labor, tools, equipment, materials, consumables, services, transportation, storage, and supervision necessary to pe…
The project would install a new septic system (septic tank and drain field) at the MFC-721 Transient Reactor Test (TREAT) office building.…
Award Number: DE-EE0009270, CX(s) Applied: A9, B3.6, B1.26, Bioenergy Technologies Office, Location(s): IL, Office(s): Golden Field Office