The project will be the complete physical demolition of Building 526. Building 526 is 27,194 sq. ft. and was built in 1943. The building was used f…
Design, installation, and operation of a iron-air multi-day storage system: which would include: site grading and temporary construction facilities…
BPA proposes to demolish an aging 12.5kV control house and replace a 48VDC control voltage breaker. The new breaker would work with the 130VDC batt…
The F Tank Farm facility requires the replacement of RADCON trailer 241-24F. The trailer is aged and needs to be replaced to enhance work related a…
The Western Sector Treatment System has remediated soil and groundwater. As the remediation has matured, much of its equipment is no longer necessa…
WAPA is proposing to demolish and dispose of an existing unused storage building, located at the Elverta Substation. This building is known as Buil…
Carport Removal of 763-12B including a section of fence and posts.…
Disassemble and remove damaged shed beside 702-A.…
Removal of carpool shack (54-17 G) in AM and DO parking lot in N-Area.…
UPC sub-contractor to remediate asbestos before demolishing and removing (2) unused Handi-Houses to the C and D Landfill from the HY1 Laydown Yard.…