Four double-wide trailers will be removed and replaced with (4) new double-wide trailers in the same locations. The old trailers will be excessed o…
A 20 foot sealand/conex will be relocated from K-Area to SRPPF for use as a universal waste storage area.…
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform relocation of buildings (including, but not limited to, trailers and …
Central Plateau Cleanup Company (CPCCo) and its subcontractors perform relocation of buildings (including, but not limited to, trailers and prefabr…
The proposed work activity is to relocate a portable shed from a storage area between Buildings 211-9F and 235-F to the East wall of Building 707-1…
Installation of Single Wide Trailer at 711-6N.…
Purpose: To ensure the safety and reliability of the bulk electric system.…
This EEC covers disconnecting commodities to seatrains 763-118N and 763-119N to prepare for relocation.…
Maintenance, repairs, renovations, and upkeep will focus on these systems: plumbing, building envelope, electrical, telecommunication, and research…
This EEC covers disconnecting electrical commodities, relocating crew shacks 717-35F, 717-36F, 717-37F, 717-38F and 717-39F and installing new elec…