The U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) proposes to perform administrative, planning, non-experimental research, a…
Construct 20'x60' structure in which Substation/Switchgearwill be installed. Excavate trenches for conduit installation between Power Plants and S…
Replacement of existing reclosers with new vacuum reclosers, Addition of auto-source transfer equipment on our existing distribution lines to impro…
Installation of new transmission poles and overhead line equipment in existing right-of-way and removing of existing poles and accessories. Replace…
Completion of full engineering design of a SCADA system for our electric distribution system and installation of SCADA electronic equipment at two …
This project involves installing a new underground line from the Colvill substation to the Grand Portage Band of Lake Superior Chippewa Tribal boun…
DOE-LM proposes the following activities to support installation of six groundwater monitoring wells located outside of the Bluewater, New Mexico, …
Conduct soil gas sampling in support of site characterization activities for CO2 storage complex.…
This project scope includes conceptually designing a 3D seismic survey in order to access subsurface geologic information as well as applying for a…
Install combined battery and heat pump systems, with additional smart thermostats installed where appropriate, in LMI occupied homes. These devices…