EIS-0020: Final Environmental Impact Statement

Crude Oil Transport Alternate From Naval Petroleum Reserve No. 1 Elk Hills/SOHIO Pipeline Connection Conveyance System, Terminal Tank Farm Relocation to Rialto, California

Office of NEPA Policy and Compliance

June 1, 1978
minute read time

Crude Oil Transport Alternate From Naval Petroleum Reserve No. 1 Elk Hills/SOHIO Pipeline Connection Conveyance System, Terminal Tank Farm Relocation to Rialto, California

Note on the organization of this Final EIS: The four volumes posted here comprise the Final EIS; each successive volume is abbreviated and incorporates its predecessor. Specifically, DOE/EIS-0020 originated from a Department of the Navy Final EIS, part of which was incorporated into DOE's May 1978 two-volume Draft listed below. DOE's June 1978 Final EIS incorporates the preceding three volumes.