Western Area Power Administration (WAPA) issued a draft EA for the Campbell County Wind Farm 2 Project (DOE/EA-2062) in Campbell County, South Dakota. The proposed project would include construction of a 98.9-megawatt wind farm generating facility that would interconnect to WAPA’s Bismarck to Glenham 230 kilo-volt transmission line at the existing Campbell County switchyard. The draft EA tiers off the analysis conducted in the Upper Great Plains Wind Energy Final Programmatic Environmental Impact Statement (DOE/EIS-0408).
For more information, see Campbell County Wind Farm 2.