A new AHU is needed for the 234-H Office. Existing supply ductwork from the 234-H Office AHU needs to be disconnected and removed. Once the replace…
Office of NEPA Policy and Compliance
July 22, 2025A new AHU is needed for the 234-H Office. Existing supply ductwork from the 234-H Office AHU needs to be disconnected and removed. Once the replacement unit is installed, new transition ductwork pieces will be connected to the Office AHU and existing supply ductwork.