CX-012724: Categorical Exclusion Determination

Advanced Test Reactor (ATR) Electronic Message Board Installation CX(s) Applied: B1.7Date: 41830 Location(s): IdahoOffices(s): Nuclear Energy

Office of NEPA Policy and Compliance

July 10, 2014
Estimated Read Time   min
Advanced Test Reactor (ATR) Electronic Message Board Installation
CX(s) Applied: B1.7
Date: 41830
Location(s): Idaho
Offices(s): Nuclear Energy

The scope of work for this project involves the installation of a new electronic information sign at the south end of the sidewalk by the guardhouse (Test Reactor Area [TRA]-658). The sign would be mounted on metal posts just south of the first sidewalk light pole. The new sign would be powered from the light pole outlet circuit via a power supply to be located in TRA-641. A wireless ethernet kit would be installed in the sign and inside TRA-658 for the network connection.

Document(s) Available for Download