CX-011976: Categorical Exclusion Determination

Chrysler Group Limited Liability Company Retooling, Reequipping, and Engineering Integration at Various United States Facilities ‐ Specific Project #5 CX(s) Applied: B1.15, B1.31, B5.1 Date: 10/12/2010 Location(s): Michigan, Indiana, Illinois, Ohio ...

Office of NEPA Policy and Compliance

October 12, 2010
Estimated Read Time   min
Chrysler Group Limited Liability Company Retooling, Reequipping, and Engineering Integration at Various United States Facilities ‐ Specific Project #5
CX(s) Applied: B1.15, B1.31, B5.1
Date: 10/12/2010
Location(s): Michigan, Indiana, Illinois, Ohio
Offices(s): Advanced Technology Vehicles Manufacturing Loan Program

The Department of Energy's proposed action is to issue a loan for the retooling and expansion necessary to manufacture the renewed…, as well as associated engineering integration. The project would be performed at the… Retooling would include installation of new production equipment to manufacture the above mentioned… including installation of assembly fixtures and tools, robots, conveyors and test equipment. The loan request would also include… A Title V air permit has been issued by the… for the proposed expansion work and no other permits or modifications would be required for the retooling and expansion portion of the loan. Existing water and waste permits would be used.