University Boulevard Water Meter Installation CX(s) Applied: B2.2 Date: 08/14/2013 Location(s): Idaho Offices(s): Nuclear Energy
Office of NEPA Policy and Compliance
August 14, 2013University Boulevard Water Meter Installation
CX(s) Applied: B2.2
Date: 08/14/2013
Location(s): Idaho
Offices(s): Nuclear Energy
The project would install water meters for the purpose of measuring water use at each of four University Boulevard (UB) buildings at 535, 655, 625, and 595 University Boulevard (IF-680 (UB1), IF-682 (UB3), and IF-684 (UB4)) in Idaho Falls, Idaho during the projected time period of August and September, 2013 at an approximate cost of $20,000 - $95,000 depending upon whether the work can be completed from inside the building(s) or must be performed exterior to the building(s)
CX(s) Applied: B2.2
Date: 08/14/2013
Location(s): Idaho
Offices(s): Nuclear Energy
The project would install water meters for the purpose of measuring water use at each of four University Boulevard (UB) buildings at 535, 655, 625, and 595 University Boulevard (IF-680 (UB1), IF-682 (UB3), and IF-684 (UB4)) in Idaho Falls, Idaho during the projected time period of August and September, 2013 at an approximate cost of $20,000 - $95,000 depending upon whether the work can be completed from inside the building(s) or must be performed exterior to the building(s)