Upgrade Room Exhaust Flow Path of HB-Line Confinement Ventilation System CX(s) Applied: B2.2 Date: 06/21/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
June 21, 2012Upgrade Room Exhaust Flow Path of HB-Line Confinement Ventilation System
CX(s) Applied: B2.2
Date: 06/21/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
In order to process the material in the Alternate Feed Stock 2 (AFS-2) Campaign, the room exhaust flow path of the Confinement Ventilation System (CVS) on the 5th and 6th levels of HB-Line must be upgraded from the functional class criteria of Safety Significant (SS) to the functional class criteria of Safety Class (SC).
CX(s) Applied: B2.2
Date: 06/21/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
In order to process the material in the Alternate Feed Stock 2 (AFS-2) Campaign, the room exhaust flow path of the Confinement Ventilation System (CVS) on the 5th and 6th levels of HB-Line must be upgraded from the functional class criteria of Safety Significant (SS) to the functional class criteria of Safety Class (SC).