Whitefish In-line Hydroelectric Project CX(s) Applied: B4.1 Date: 05/01/2012 Location(s): Montana Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
May 1, 2012Whitefish In-line Hydroelectric Project
CX(s) Applied: B4.1
Date: 05/01/2012
Location(s): Montana
Offices(s): Bonneville Power Administration
In response to the City of Whitefish’s small generator interconnection request, Bonneville Power Administration proposes to integrate their existing 261-kilowatt In-Line Hydroelectric Project into the Federal Columbia River Transmission System (FCRTS).
CX(s) Applied: B4.1
Date: 05/01/2012
Location(s): Montana
Offices(s): Bonneville Power Administration
In response to the City of Whitefish’s small generator interconnection request, Bonneville Power Administration proposes to integrate their existing 261-kilowatt In-Line Hydroelectric Project into the Federal Columbia River Transmission System (FCRTS).