Culvert Replacement Near 81-66-SX-15CX(s) Applied: B1.3Date: 10/26/2009Location(s): Casper, WyomingOffice(s): RMOTC
Office of NEPA Policy and Compliance
October 26, 2009Culvert Replacement Near 81-66-SX-15
CX(s) Applied: B1.3
Date: 10/26/2009
Location(s): Casper, Wyoming
Office(s): RMOTC
We have a drainage problem with this Culvert near 81-66-SX-15, and have tried to blast it out with water from a fire hose to no avail. We think that it is collapsed in the middle. The environmental impact should be very small from digging the culvert out and replacing it. The job should take no longer then one day and will require two men, a backhoe, and picker truck to complete. The culvert will be replaced. Any contaminated soils will be replaced with fresh soil.