Verification Survey of the Building 4059 Site (Phase B)

Decontamination and decommissioning (D&D) of the radiologically contaminated facilities began in the late 1960’s and continues today, as the remaining DOE program operations at ETEC were terminated effective September 30, 1995.  As part of this D&D program, Rocketdyne and Boeing have performed decommissioning and final status surveys (FSS) of a number of facilities that supported the various nuclear-related ETEC operations during the latter part of the 1950’s and SSFL  0453-SR-01-0  continuing through to the present.