EM Newsletters

RSS
A groundwater diagram
A groundwater treatment well that EM installed two years ago at the Idaho National Laboratory Site is working in parallel with a pump-and-treat system to yield great dividends for the water quality of the underlying Snake River Plain Aquifer.
A large group of people post for a picture
The Oak Ridge Office of Environmental Management and cleanup contractor UCOR recently hosted a new safety culture assistance team that will visit DOE worksites to identify strengths and any gaps to excellence.
Aerial shot of a laboratory
EM project managers at the Idaho National Laboratory (INL) Site have released a draft document to the public proposing a final end state for residual granulated calcine waste, piping, tanks and equipment associated with historic spent nuclear fuel reprocessing.
A man doing maintenance on a wall filled with wires and hoses
A Hanford Site contractor responsible for designing, building and commissioning the Waste Treatment and Immobilization Plant (WTP) has recognized the collaborative efforts of three of its key suppliers with Supply Chain Excellence Awards.
2 deer in front of headlights standing on a dark road beside grass
A recent study conducted at the Savannah River Site (SRS) by scientists and students from the University of Georgia’s Savannah River Ecology Laboratory (SREL) sheds light on the ability of drivers to observe animals and avoid dangerous wildlife-vehicle collisions at night safely.