EM Newsletters

RSS
A control room monitor displaying workers performing maintenance
The EM Office of River Protection (ORP) and contractor Washington River Protection Solutions (WRPS) have completed the first waste processing campaign through the Tank-Side Cesium Removal (TSCR) System at the Hanford Site.
A group of workers in white hard hats pose for a group picture in WIPP's underground disposal facility
Just before the new year, there was quite the ribbon-cutting at EM’s Waste Isolation Pilot Plant (WIPP). At the event, the spinning teeth of a multi-ton mechanical mining machine clawed through the ceremonial ribbon and began cutting a new disposal panel out of a 250-million-year-old layer of salt beneath the New Mexico desert.