RSS

High School Students Get Real World Experience With Hanford Site Mentors

Six safety representatives with Office of River Protection tank farms contractor recently received Safety and Health Administration certifications.

The Green Electronics Council has recognized two EM sites and several contractors at Hanford.

EM’s Waste Isolation Pilot Plant (WIPP) received its 12,500th transuranic (TRU) waste shipment since operations began there in 1999.

Crew members used ingenuity and lessons learned to develop a conveyor system to safely remove material containing asbestos from inside a building.

EM workers have torn down the west end of Building 3017 at the Oak Ridge National Laboratory after more than a decade of challenges.
Mark Beene started his professional driving career in 1990 and for the past 20 years has been safely transporting the nation’s defense-generated waste

The Savannah River Site recently cleared a path to move bundled spent nuclear fuel assemblies vertically instead of horizontally

Two prime contractors at EM’s Paducah Site were recognized by Kentucky’s governor for excellence in health and safety performance for the past year.
EM Richland Operations Office contractor Mission Support Alliance (MSA) boosted efficiency at the Hanford Site by replacing multiple programs.