The ICP CAB requests that DOE release the results of the "business-case" study of a future mission for the Advanced Mixed Waste Treatment Project.
The INL Site EM CAB recommends that DOE-EM support the budget request for full funding of Idaho cleanup operations in Fiscal Year 2018
The INL Site EM CAB recommends a $30 million annual increase in the Idaho Cleanup Project's budget to continue DOE's momentum toward cleanup.
The INL Site EM CAB recommends that CH2M-WG Idaho's contract with DOE-EM be extended through 2015 in order to complete current funded work scope
The INL Site EM CAB is opposed to consideration of the INL as a potential disposal location for GTCC Low-Level Radioactive Waste and GTCC Like Waste
The INL Site EM CAB supports the preferred alternative for the multipurpose haul road within the Idaho Site (route south of T-25 power line)
The INL Site EM CAB recommends that DOE-EM increase ICP funding for FYs 2011 and 2012 from $412 million to $450 million
The INL Site EM CAB supports Alternative 3 in the Engineering Evaluation/Cost Analysis for Experiment Breeder Reactor (EBR) II D&D
The CAB supports the preferred alternative outlined in the Proposed Plan for Sitewide Groundwater, Miscellaneous Sites, and Process for Future Sites
The INL Site EM CAB unanimously supports Alternative 3 in the Engineering Evaluation/Cost Analysis (EE/CA) for decommissioning of TRA-632 hot cells