More Resources
-
DocumentJuly 13, 2026120V Power and Network are needed in H-Area 4th Level Control Room for L-Area VMAC Remote Workstation (RWS) addition.120V Power will need to be fed…Office of NEPA Policy and Compliance
-
July 13, 2026Small radioactive particles will be deposited on planchets using aerosolization. These particles will be used as reference standards for various an…Office of NEPA Policy and Compliance
-
July 13, 2026Install Piezometers at Pond 2 Dam and Pond 4 Dam for Geotechnical Investigation/Characterization.…Office of NEPA Policy and Compliance
-
July 13, 2026Replacement of the 221-F Canyon roof to fix water intrusion into 221-F. Conduit, piping and walkways will be removed to effectively replace roof.…Office of NEPA Policy and Compliance
-
DocumentJuly 13, 2026K-Area Fuel Point Closure at 715-K. Provide labor, materials, and services to permanently close the K-Area Fuel Station. Closure must comply with r…Office of NEPA Policy and Compliance
-
July 10, 2026CESER’s Infrastructure Hardening and Technology Development division is responsible for a range of defensive programs including Cyber Testing for Resilient Industrial Control Systems (CyTRICS) and Cyber-Informed Engineering (CIE).Office of Cybersecurity, Energy Security, and Emergency Response
-
July 10, 2026DOE announced up to $100 million in federal funding to refurbish and modernize the nation’s existing coal power plants.Hydrocarbons and Geothermal Energy Office
-
External ResourceJuly 10, 2026NREL Uses Advanced Grid Research Environment for First-Ever Example of Type-3 Turbines Using Grid-Forming Controls
-
July 10, 2026Stanton Rehearing Request by PIOs Exhibit 69Office of Cybersecurity, Energy Security, and Emergency Response