From the Blog
-
July 14, 2021Researchers have leveraged existing advanced X-ray microscopy techniques to bridge the gap between MRI electron microscopy imaging.
-
July 14, 2021Physics Ph.D. third-year student Robert Victor Chirco has been selected to receive an Office of Science Graduate Student Research award.
-
July 14, 2021The graphene camera represents a new type of sensor useful for studying cells and tissues that generate electrical voltages.
-
July 13, 2021Almost a year after shutting off three vapor treatment units at a former radioactive and hazardous waste landfill at the Idaho National Laboratory Site, analytical data from thousands of vapor samples indicate that cleanup objectives have been achieved.Office of Environmental Management
-
July 13, 2021EM Acting Assistant Secretary William “Ike” White visited the Portsmouth Site last month to get a firsthand look at demolition and disposal progress as part of the ongoing decontamination and decommissioning of the site.Office of Environmental Management
-
July 13, 2021Brian Vance, manager of the EM Office of River Protection and Richland Operations Office, recently hosted a roundtable discussion with tribal nations located near the Hanford Site.Office of Environmental Management
-
July 13, 2021For the first time, workers at EM’s Paducah Site are able to closely examine the primary source of off-site groundwater contamination directly underneath the C-400 Cleaning Building.Office of Environmental Management
-
July 13, 2021Reclassifying dozens of year-round interns as apprentices at Savannah River Nuclear Solutions (SRNS) has benefited both the students and the management and operations contractor at the Savannah River Site (SRS).Office of Environmental Management
-
July 13, 2021EM Hanford Waste Treatment and Immobilization Plant team recently finished startup testing for the Low-Activity Waste Facility's uninterruptible electrical power system, one of the plant's vital safeguards in the unlikely event of temporary power loss.Office of Environmental Management
-
July 13, 2021EM and the management and operations contractor at the Savannah River Site (SRS) have surpassed a major environmental restoration milestone by deactivating and decommissioning (D&D) 50 buildings — more than 1 million square feet of space — since 2008.Office of Environmental Management