More Resources
-
December 1, 2025Construction group will be renovating 704-H.…Office of NEPA Policy and Compliance
-
December 1, 2025Remove and replace broken floor tiles in 724-H.…Office of NEPA Policy and Compliance
-
December 1, 2025The current method of filling the basin is an altitude valve designed to make up for large drops in basin level and not for routine smaller changes…Office of NEPA Policy and Compliance
-
December 1, 2025Remove carpet and cove base in 703-46A. Install LVP flooring and new cove base due to wear and tear at the limited area entrance of 703-46A.…Office of NEPA Policy and Compliance
-
December 1, 2025This work scope covers installing new flooring and cove base in building 717-8N.…Office of NEPA Policy and Compliance
-
December 1, 2025New stretch wrap machines will be installed at the 731-N Complex.…Office of NEPA Policy and Compliance
-
December 1, 2025Remove and abate mastic tile floor and refinish concrete in 284-10F.…Office of NEPA Policy and Compliance
-
December 1, 2025This EEC will cover the laboratory preparation and analysis (within the analytical services shared lab) for environmental samples from multiple res…Office of NEPA Policy and Compliance
-
December 1, 2025This experiment is being conducted to assess temperatures, pressures, and materials proposed for trapping zinc in the tritium facilities. Revision …Office of NEPA Policy and Compliance