More Resources
-
May 11, 2026These work activities are associated with the electrical repairs/upgrades to building 717-3N.…Office of NEPA Policy and Compliance
-
May 11, 2026Install two prefabricated trailers (705-57H and 705-58H) in the northeast parking lot of 766-H.…Office of NEPA Policy and Compliance
-
May 11, 2026Installation of Video Teleconference (VTC) at 709-7G Room 102.…Office of NEPA Policy and Compliance
-
May 11, 2026Grind concrete floor to assure proper operation of the installed room divider at 705-3C room 134 per AOS work request 00841143.…Office of NEPA Policy and Compliance
-
May 11, 2026Construction to remove old carpet and cove base. Paint the exterior walls and any other walls/office areas identified in 730-1B, 2nd Floor.…Office of NEPA Policy and Compliance
-
May 11, 2026Installation of new Quad wide trailers (707-69B, 707-72B, 707-73B, 707-74B, and 707-75B) and utilities and two restroom trailers and utilities (707…Office of NEPA Policy and Compliance
-
May 11, 2026The Hand Geometry Units (HGU) for access to 703-42A requires replacement. The ability for designated qualified personnel to access their work space…Office of NEPA Policy and Compliance
-
May 11, 2026The Department of Energy (DOE) has developed a series of best practices and case studies to help builders improve whole-house energy performance in buBuildings
-
May 11, 2026The U.S. Department of Energy announced contracts have been awarded for 53.3 million barrels of crude oil from the Strategic Petroleum ReservesOffice of Petroleum Reserves