December 5, 2018

December 2018 Environmental Bulletin Volume 30 Number 12

The Fifth Five-Year Remedy Review is being conducted in five phases for operable units (OUs) with similar remedies.

November 28, 2018

November 2018 Environmental Bulletin Volume 30 Number 11

The United States Department of Energy (DOE) will release a Statement of Basis / Proposed Plan (SB/PP) for the G-Area Oil Seepage Basin (GOSB)...

September 28, 2018

September 2018 Environmental Bulletin Volume 30 Number 9

The U. S. Department of Energy (DOE) has begun conducting the Sixth Five-Year Remedy Review for remedial actions implemented at the Savannah River...

September 19, 2018

September 2018 Environmental Bulletin Volume 30 Number 10

The U.S. Department of Energy (DOE) Office of Environment, Health, Safety and Security has submitted a notice of proposed rulemaking (NOPR) to the...

July 25, 2018

July 2018 Environmental Bulletin Volume 30 Number 8

Savannah River Remediation (SRR), the Savannah River Site (SRS) Liquid Waste System contractor for The U.S. Department of Energy (DOE) recently...

June 20, 2018

June 2018 Environmental Bulletin Volume 30 Number 7

The Record of Decision (ROD) for Remedial Alternatives for the Wetland Area at Dunbarton Bay (WADB), a subunit of the Steel Creek Integrator...

June 6, 2018

June 2018 Environmental Bulletin Volume 30 Number 6

The U. S. Department of Energy (DOE) has selected the preferred alternative for the non-time critical removal action for the P-Area Groundwater...

May 30, 2018

May 2018 Environmental Bulletin Volume 30 Number 5

The Department of Energy (DOE)-Savannah River Operations Office has requested from the Department of Health and Environmental Control (DHEC) a...

April 10, 2018

April 2018 Environmental Bulletin Volume 30 Number 4

The U. S. Department of Energy (DOE) is proposing to perform a non-time critical removal action for the P-Area Groundwater Operable Unit (PAGW OU)...

March 27, 2018

March 2018 Environmental Bulletin Volume 30 Number 3

The Fifth Five-Year Remedy Review Report is being conducted in five phases for operable units (OUs) with similar remedies...