CX-012399: Categorical Exclusion Determination

Vapor Intrusion Mitigation Pilot Study and Potential Full-Scale Sub-Slab Depressurization System Design/Build for Building 100 CX(s) Applied: B3.1, B6.1, B6.2 Date: 07/10/2014 Location(s): Florida Offices(s): Legacy Management

Office of NEPA Policy and Compliance

July 2, 2014
Estimated Read Time   min

Vapor Intrusion Mitigation Pilot Study and Potential Full-Scale Sub-Slab Depressurization System Design/Build for Building 100 
CX(s) Applied: B3.1, B6.1, B6.2
Date: 07/10/2014
Location(s): Florida

Offices(s): Legacy Management LM is proposing to hire a subcontractor to perform a vapor intrusion mitigation pilot study and, if warranted, design and implement a full-scale sub-slab depressurization system for Building 100 at the Pinellas site.