Hawkins-Alvey Line Impairment CX(s) Applied: B1.3 Date: 05/08/2014 Location(s): Oregon Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
May 8, 2014Hawkins-Alvey Line Impairment
CX(s) Applied: B1.3
Date: 05/08/2014
Location(s): Oregon
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) has identified a potential safety issue with Hawkins-Alvey No. 1 structure 8/4 to 8/6 with respect to ground to conductor clearance. BPA proposes to increase the height of the conductor by installing taller wood.
CX(s) Applied: B1.3
Date: 05/08/2014
Location(s): Oregon
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) has identified a potential safety issue with Hawkins-Alvey No. 1 structure 8/4 to 8/6 with respect to ground to conductor clearance. BPA proposes to increase the height of the conductor by installing taller wood.