Amargosa Substation (Conduit and Storage Pad Installation) CX(s) Applied: B1.3 Date: 06/03/2014 Location(s): Nevada Offices(s): Western Area Power Administration-Desert Southwest Region
Office of NEPA Policy and Compliance
June 3, 2014Amargosa Substation (Conduit and Storage Pad Installation)
CX(s) Applied: B1.3
Date: 06/03/2014
Location(s): Nevada
Offices(s): Western Area Power Administration-Desert Southwest Region
Western Area Power Administration (WAPA) proposes two activities in the existing Amargosa Substation located in Henderson, Clark County, Nevada. The purpose of the project is to remove hazard to personnel from exposed cable; and to prevent material damage by installing a concrete pad for storage.
CX(s) Applied: B1.3
Date: 06/03/2014
Location(s): Nevada
Offices(s): Western Area Power Administration-Desert Southwest Region
Western Area Power Administration (WAPA) proposes two activities in the existing Amargosa Substation located in Henderson, Clark County, Nevada. The purpose of the project is to remove hazard to personnel from exposed cable; and to prevent material damage by installing a concrete pad for storage.