CX-012001: Categorical Exclusion Determination

Meter Installation at Fossil Lake Solar Project CX(s) Applied: B1.7 Date: 04/24/2014 Location(s): Oregon Offices(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

April 24, 2014
Estimated Read Time   min
Meter Installation at Fossil Lake Solar Project
CX(s) Applied: B1.7
Date: 04/24/2014
Location(s): Oregon
Offices(s): Bonneville Power Administration

Bonneville Power Administration proposes to install a revenue meter at the planned 10-megawatt Fossil Lake solar project in Lake County, Oregon. The meter would allow power generated from Obsidian Renewables’ solar project to be integrated into the Federal Columbia River Transmission System via Midstate Electric Cooperative. The proposed point of interconnection would be at the Midstate Electric Cooperative’s Christmas Valley Substation.