Repair Corroded Flow Line Near 33-SX-11 CX(s) Applied: B5.4, B5.6 Date: 12/30/2013 Location(s): Wyoming Offices(s): RMOTC
Office of NEPA Policy and Compliance
December 30, 2013Repair Corroded Flow Line Near 33-SX-11
CX(s) Applied: B5.4, B5.6
Date: 12/30/2013
Location(s): Wyoming
Offices(s): RMOTC
The purpose of this task is to repair a location on an existing flowline that runs from well 33-SX-11. A clamp will be placed on the flow line to repair a corroded area in the line that caused a 15 bbls crude oil and produced water leak.
CX(s) Applied: B5.4, B5.6
Date: 12/30/2013
Location(s): Wyoming
Offices(s): RMOTC
The purpose of this task is to repair a location on an existing flowline that runs from well 33-SX-11. A clamp will be placed on the flow line to repair a corroded area in the line that caused a 15 bbls crude oil and produced water leak.