Chrysler Group Limited Liability Company Retooling, Reequipping, and Engineering Integration at Various United States Facilities ‐ Specific Project #10 CX(s) Applied: B1.31, B5.1 Date: 10/12/2010 Location(s): Michigan, Indiana, Illinois, Ohio Office...
Office of NEPA Policy and Compliance
October 12, 2010CX(s) Applied: B1.31, B5.1
Date: 10/12/2010
Location(s): Michigan, Indiana, Illinois, Ohio
Offices(s): Advanced Technology Vehicles Manufacturing Loan Program
The Department of Energy's proposed action is to issue a loan to Chrysler Group Limited Liability Company for reequipping, retooling and engineering integration at the…for the manufacturing of… Retooling at…would include the installation of new production equipment, including assembly fixtures and tools, robots, conveyors and test equipment. It would also require upgrades to the existing paint shop (no external construction required). For the reequipping and retooling portion of the project, the upgrades to the existing paint shop would require a major modification to the existing major source Title V air permit. The upgrades would also require notification to the local Publicly Owned Treatment Works; however, it would not require modifications to the existing water discharge permit. Existing waste permits would be utilized. No other permits or modifications would be required for this portion of the project.