Chrysler Group Limited Liability Company Retooling, Reequipping, and Engineering Integration at Various United States Facilities ‐ Specific Project #8 CX(s) Applied: B1.31, B5.1 Date: 10/12/2010 Location(s): Michigan, Indiana, Illinois, Ohio Offices...
Office of NEPA Policy and Compliance
October 12, 2010CX(s) Applied: B1.31, B5.1
Date: 10/12/2010
Location(s): Michigan, Indiana, Illinois, Ohio
Offices(s): Advanced Technology Vehicles Manufacturing Loan Program
The Department of Energy's proposed action is to issue a loan to Chrysler Group Limited Liability Company for the reequipping, retooling and engineering integration at the…for the manufacturing of the… New machining equipment, machine tools, assembly fixtures, robots, conveyors and test equipment would be installed to build the… The reequipping and retooling portion of the project would not require any new construction. The…facility has an existing Title V air permit for…manufacturing and… There is currently an application modification in process to permit additional…which will change the facility from a Minor Source to a Major Source. No other new permits or modifications would be required for the project. Waste water will be stored and shipped offsite for disposal, as is currently the practice at the facility. Although wetlands and floodplains are present on the facility site, these resources will not be affected as the project involves no further construction and all operations would be inside existing buildings.