Chrysler Group Limited Liability Company Retooling, Reequipping, and Engineering Integration at Various United States Facilities ‐ Specific Project #4 CX(s) Applied: B1.31, B5.1 Date: 10/15/2010 Location(s): Michigan, Indiana, Illinois, Ohio Offices...
Office of NEPA Policy and Compliance
October 15, 2010CX(s) Applied: B1.31, B5.1
Date: 10/15/2010
Location(s): Michigan, Indiana, Illinois, Ohio
Offices(s): Advanced Technology Vehicles Manufacturing Loan Program
The Department of Energy's proposed action is to issue a loan to Chrysler Group Limited Liability Company for the retooling, reequipping and engineering integration of the existing… in order to produce… The production portion of the loan request includes installation of new production equipment such as machining equipment, machine tools, … assembly fixtures, robots, conveyors and test equipment. An existing Title V air permit that had been obtained prior to the initiation of construction of the facility would be used. The facility is considered a hazardous waste generator and has an identification number, but the project would not require a change in generator status. All process wastewater would be collected and shipped off‐site for treatment; therefore no wastewater permit is required.