Disposition of Kerr Hollow Quarry Shredder Project CX(s) Applied: B1.3, B1.28, B1.31 Date: 06/05/2013 Location(s): Tennessee Offices(s): Y-12 Site Office
Office of NEPA Policy and Compliance
June 5, 2013Disposition of Kerr Hollow Quarry Shredder Project
CX(s) Applied: B1.3, B1.28, B1.31
Date: 06/05/2013
Location(s): Tennessee
Offices(s): Y-12 Site Office
The proposed action is to characterize and disposition of the shredder equipment that was used on the Kerr Hollow Quarry Project. The Kerr Hollow Quarry project consisted of using a remotely operated pontoon barge equipped with a crane and a heavy lift grapple, working in conjunction with a submersible drone, to lift items from the bottom of the quarry and place them into this underwater shredder.
CX(s) Applied: B1.3, B1.28, B1.31
Date: 06/05/2013
Location(s): Tennessee
Offices(s): Y-12 Site Office
The proposed action is to characterize and disposition of the shredder equipment that was used on the Kerr Hollow Quarry Project. The Kerr Hollow Quarry project consisted of using a remotely operated pontoon barge equipped with a crane and a heavy lift grapple, working in conjunction with a submersible drone, to lift items from the bottom of the quarry and place them into this underwater shredder.