Security Upgrade Project CX(s) Applied: B1.3, B1.11 Date: 08/22/2012 Location(s): Tennessee Offices(s): Y-12 Site Office
Office of NEPA Policy and Compliance
August 22, 2013Security Upgrade Project
CX(s) Applied: B1.3, B1.11
Date: 08/22/2012
Location(s): Tennessee
Offices(s): Y-12 Site Office
The proposed action is to add fence posts and run razor wire in various fence locations throughout the site. This project will not require excavation. This activity will disturb gravel but will not remove gravel and soil from post holes which will be placed back in the same area.
CX(s) Applied: B1.3, B1.11
Date: 08/22/2012
Location(s): Tennessee
Offices(s): Y-12 Site Office
The proposed action is to add fence posts and run razor wire in various fence locations throughout the site. This project will not require excavation. This activity will disturb gravel but will not remove gravel and soil from post holes which will be placed back in the same area.