CX-011226: Categorical Exclusion Determination

Big Hill Anhydrite Pond Sampling and Analysis CX(s) Applied: B3.1 Date: 09/23/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office

Office of NEPA Policy and Compliance

March 13, 2014
Estimated Read Time   min
Big Hill Anhydrite Pond Sampling and Analysis
CX(s) Applied: B3.1
Date: 09/23/2013
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office

Subcontractor shall provide all labor, supervision, tools, equipment, materials and transportation required to collect samples from the Big Hill anhydrite pond for chemical analysis.