Advanced Test Reactor (ATR) Primary Coolant Leak Rate Determination System Equipment Replacement CX(s) Applied: B2.2 Date: 07/24/2013 Location(s): Idaho Offices(s): Nuclear Energy
Office of NEPA Policy and Compliance
July 24, 2013Advanced Test Reactor (ATR) Primary Coolant Leak Rate Determination System Equipment Replacement
CX(s) Applied: B2.2
Date: 07/24/2013
Location(s): Idaho
Offices(s): Nuclear Energy
The purpose of this project is to automate the Advanced Test Reactor (ATR) Primary Coolant Leak Rate Determination System by replacing existing flow transmitters and installing new transmitters to provide a redundant signal.
CX(s) Applied: B2.2
Date: 07/24/2013
Location(s): Idaho
Offices(s): Nuclear Energy
The purpose of this project is to automate the Advanced Test Reactor (ATR) Primary Coolant Leak Rate Determination System by replacing existing flow transmitters and installing new transmitters to provide a redundant signal.