Oracle to Tucson 115 Kilovolt Transmission Line, Cross Arm Replacements at Structure 2/5 and 7/3 CX(s) Applied: B1.3 Date: 05/02/2013 Location(s): Arizona, Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Office of NEPA Policy and Compliance
May 2, 2013Oracle to Tucson 115 Kilovolt Transmission Line, Cross Arm Replacements at Structure 2/5 and 7/3
CX(s) Applied: B1.3
Date: 05/02/2013
Location(s): Arizona, Arizona
Offices(s): Western Area Power Administration-Desert Southwest Region
Western Area Power Administration (Western) proposes to conduct cross arm replacements at two wood pole structures located on the existing Oracle to Tucson 115 kilovolt transmission line and Pinal and Pima counties, Arizona.
CX(s) Applied: B1.3
Date: 05/02/2013
Location(s): Arizona, Arizona
Offices(s): Western Area Power Administration-Desert Southwest Region
Western Area Power Administration (Western) proposes to conduct cross arm replacements at two wood pole structures located on the existing Oracle to Tucson 115 kilovolt transmission line and Pinal and Pima counties, Arizona.