WVDP-2012-01 WVDP Reservoir Interconnecting Canal Maintenance Activities CX(s) Applied: B1.3 Date: 08/02/2012 Location(s): New York Offices(s): West Valley Demonstration Project
Office of NEPA Policy and Compliance
August 2, 2012WVDP-2012-01 WVDP Reservoir Interconnecting Canal Maintenance Activities
CX(s) Applied: B1.3
Date: 08/02/2012
Location(s): New York
Offices(s): West Valley Demonstration Project
The purpose of this project is to mitigate impedance of design flow and drainage between the two West Valley Demonstration Project water supply reservoirs. Sedimentation and bank sloughing has resulted in filling of the reservoir interconnecting canal impeding design water flow within the system.
CX(s) Applied: B1.3
Date: 08/02/2012
Location(s): New York
Offices(s): West Valley Demonstration Project
The purpose of this project is to mitigate impedance of design flow and drainage between the two West Valley Demonstration Project water supply reservoirs. Sedimentation and bank sloughing has resulted in filling of the reservoir interconnecting canal impeding design water flow within the system.