Storm Water Control Measures at Individual Permit Site, TA-72 CX(s) Applied: B1.33, B6.1 Date: 11/14/2012 Location(s): New Mexico Offices(s): Los Alamos Site Office
Office of NEPA Policy and Compliance
November 14, 2012Storm Water Control Measures at Individual Permit Site, TA-72
CX(s) Applied: B1.33, B6.1
Date: 11/14/2012
Location(s): New Mexico
Offices(s): Los Alamos Site Office
The purpose of this project is to implement engineered storm water control measures at Technical Area 72, Sandia Watershed Site Monitoring Area 6, at Los Alamos National Laboratory.
CX(s) Applied: B1.33, B6.1
Date: 11/14/2012
Location(s): New Mexico
Offices(s): Los Alamos Site Office
The purpose of this project is to implement engineered storm water control measures at Technical Area 72, Sandia Watershed Site Monitoring Area 6, at Los Alamos National Laboratory.