Geothermal Retrofit of Illinois National Guard's State Headquarters Building CX(s) Applied: A9, B2.1, B5.19 Date: 01/14/2013 Location(s): Illinois Offices(s): Golden Field Office
Office of NEPA Policy and Compliance
January 14, 2013Geothermal Retrofit of Illinois National Guard's State Headquarters Building
CX(s) Applied: A9, B2.1, B5.19
Date: 01/14/2013
Location(s): Illinois
Offices(s): Golden Field Office
The U.S. Department of Energy is proposing to provide federal funding to the Illinois Department of Military Affairs (ILDMA) to upgrade an existing heating, ventilation and air conditioning system by installing a 61.6 ton vertical closed-loop ground source heat pump (GSHP) at Camp Lincoln, which is an Illinois Army National Guard base.
CX(s) Applied: A9, B2.1, B5.19
Date: 01/14/2013
Location(s): Illinois
Offices(s): Golden Field Office
The U.S. Department of Energy is proposing to provide federal funding to the Illinois Department of Military Affairs (ILDMA) to upgrade an existing heating, ventilation and air conditioning system by installing a 61.6 ton vertical closed-loop ground source heat pump (GSHP) at Camp Lincoln, which is an Illinois Army National Guard base.