CX-009282: Categorical Exclusion Determination

Big 8 - 922, 920, 921 Heating, Ventilation and Air Conditioning Upgrades; 921, 74 Roof Replacement; HPSB Upgrades CX(s) Applied: B2.1, B2.2, B2.3 Date: 09/07/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory

Office of NEPA Policy and Compliance

September 7, 2012
Estimated Read Time   min
Big 8 - 922, 920, 921 Heating, Ventilation and Air Conditioning Upgrades; 921, 74 Roof Replacement; HPSB Upgrades
CX(s) Applied: B2.1, B2.2, B2.3
Date: 09/07/2012
Location(s): Pennsylvania
Offices(s): National Energy Technology Laboratory

Replacement of B922 air handling units #2 and #8 and boiler #4. Replacement of B921 and B 74 roofs; HPSB upgrades for B920, 921, 922, 925 and 58.