Big Hill Fence Extension Modifications CX(s) Applied: B1.11 Date: 09/14/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
September 14, 2012Big Hill Fence Extension Modifications
CX(s) Applied: B1.11
Date: 09/14/2012
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all labor, materials, equipment, tools, fabrication, transportation, supervision, mobile lifting equipment, and rigging required to install Big Hill fence modifications.
CX(s) Applied: B1.11
Date: 09/14/2012
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all labor, materials, equipment, tools, fabrication, transportation, supervision, mobile lifting equipment, and rigging required to install Big Hill fence modifications.