Install Two Groundwater Monitoring Wells at the Bluewater Uranium Mill Tailings Radiation Control Act Site Near Grants, New Mexico CX(s) Applied: B3.1 Date: 07/19/2012 Location(s): New Mexico Offices(s): Legacy Management
Office of NEPA Policy and Compliance
July 19, 2012Install Two Groundwater Monitoring Wells at the Bluewater Uranium Mill Tailings Radiation Control Act Site Near Grants, New Mexico
CX(s) Applied: B3.1
Date: 07/19/2012
Location(s): New Mexico
Offices(s): Legacy Management
The Department of Energy proposes to install two groundwater monitoring wells, 20 (M) and 11 (SG), on the Bluewater disposal site using a truck-mounted rotary drill rig. The boreholes would extend to depths of 140 to 280 feet below ground surface and would be completed with a polyvinyl chloride casing that has an outside diameter of 4.5 inches.
CX(s) Applied: B3.1
Date: 07/19/2012
Location(s): New Mexico
Offices(s): Legacy Management
The Department of Energy proposes to install two groundwater monitoring wells, 20 (M) and 11 (SG), on the Bluewater disposal site using a truck-mounted rotary drill rig. The boreholes would extend to depths of 140 to 280 feet below ground surface and would be completed with a polyvinyl chloride casing that has an outside diameter of 4.5 inches.