CX-008691: Categorical Exclusion Determination

Mason Substation Metering Replacement Project CX(s) Applied: B1.7 Date: 06/25/2012 Location(s): Washington Offices(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

June 25, 2012
Estimated Read Time   min
Mason Substation Metering Replacement Project
CX(s) Applied: B1.7
Date: 06/25/2012
Location(s): Washington
Offices(s): Bonneville Power Administration

Bonneville Power Administration is proposing to remove existing equipment and install new revenue metering equipment in the existing Mason Substation.