CX-008690: Categorical Exclusion Determination

Lancaster Line and Load Project CX(s) Applied: B4.6, B4.7 Date: 06/28/2012 Location(s): Idaho Offices(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

June 28, 2012
Estimated Read Time   min
Lancaster Line and Load Project
CX(s) Applied: B4.6, B4.7
Date: 06/28/2012
Location(s): Idaho
Offices(s): Bonneville Power Administration

Bonneville Power Administration is proposing to add equipment to its existing Lancaster Substation, replace one transmission structure, modify one existing structure, and replace existing fiber optic cable.