CX-036440: Alvey MHQ Retaining Wall

The proposed action involves the construction of an engineered eco-block retaining wall system, backfilling of the void space with clean fill dirt …

Office of NEPA Policy and Compliance

September 15, 2026
Estimated Read Time   min

The proposed action involves the construction of an engineered eco-block retaining wall system, backfilling of the void space with clean fill dirt and rock to create a level working surface, and the installation of a safety railing. The action would be entirely within the boundaries of the Alvey Maintenance Headquarters site on previously disturbed land and would support transmission infrastructure projects.