Floor tiles that were damaged during a water issue in a hallway near Room 103 of building 736-A will be replaced. Revision 1 is necessary to includ…
Office of NEPA Policy and Compliance
August 31, 2026Floor tiles that were damaged during a water issue in a hallway near Room 103 of building 736-A will be replaced. Revision 1 is necessary to include the added work scope of removing and replacing damaged/asbestos floor tiles in the hallway outside of room 119.