CX-036296: Taft Substation Storage Building Expansion

Bonneville Power Administration (BPA) proposes to expand the existing snowcat storage building to include storage of the loader-mounted snow blower…

Office of NEPA Policy and Compliance

August 3, 2026
Estimated Read Time   min

Bonneville Power Administration (BPA) proposes to expand the existing snowcat storage building to include storage of the loader-mounted snow blower machine on BPA-owned property, in Mineral County, Montana (T19N R31W SEC7). The storage building would be 50 feet by 25 feet, built to the south and west, but connected to the existing storage building.