Planned maintenance activities at the 285-H Facility include patching leaks within and surrounding the 285-H Basin, inspecting steel channels withi…
Office of NEPA Policy and Compliance
July 22, 2026Planned maintenance activities at the 285-H Facility include patching leaks within and surrounding the 285-H Basin, inspecting steel channels within the basin, and replacing Chilled Water Supply Pump No. 4.