CX-036236: FY26 Beaufort Road Repair Project

Water flowing over Beaufort Road during heavy rain has caused the roadway surface to washout and become unpassable. Two culverts will be installed …

Office of NEPA Policy and Compliance

July 23, 2026
Estimated Read Time   min

Water flowing over Beaufort Road during heavy rain has caused the roadway surface to washout and become unpassable. Two culverts will be installed to capture and direct the water under the road to prevent this from occurring.