CX-036156: RWIS Fire Pump Overpressure Mod

The subcontractor shall furnish all materials, tools, equipment, supplies, transportation, facilities, labor, supervision and services required for…

Office of NEPA Policy and Compliance

July 28, 2026
Estimated Read Time   min

The subcontractor shall furnish all materials, tools, equipment, supplies, transportation, facilities, labor, supervision and services required for adding two (2) 10-inch new pressure reducing valves (PRVs) downstream of the fire pump and outside of the pump house along with a new 3-inch pressure relief valve downstream of the pressure reducing valves, removing three (3) process relief valves (PSVs) on fire pumps, replacing one (one) PSV with a nationally recognized testing laboratory (NTRL) on the diesel pump, BCP-604.